Consumables & expendables · base specification · all specifications
SAE AMS 3265 CLASS B
every line below is one interchangeability boundary of this document — the type/class scheme is the document's own. Counts are members a published citation stands behind; the graded, cited view is each line's family page.
Solid arrows are cited authority — who vouches; dashed are context. Neither is installation eligibility on its own — see how the regulations read this ladder, below.
- Class B AMS 3265 CLASS B Class B
Staying inside the regulation — how EASA / FAA read this ladder
Codification and qualification say who vouches for a part — they are not installation eligibility. Under EASA Part-21, eligibility flows from the approved design (type design / IPC) or an approved change; under Part-145, acceptance needs an EASA Form 1 or, for genuine standard parts, conformity traceable to the officially recognised standard (145.A.42).
- The document (MIL / AN / MS / NAS / SAE…) — Candidate "officially recognised standard" — EASA's standard-part criteria name these series. A part whose controlling data are fully public may be a standard part, buyable at source with conformity traceable to the standard; any proprietary source-control requirement takes it out of this category.
- Qualified products (QPL) — Qualification under the standard — who demonstrated compliance, per site. Strong conformity and sourcing evidence, but a US DoD instrument, not an EASA design approval.
- Codified interchangeability (FLIS I&S) — The US DoD's own substitution statement for defence supply. For a civil type it is CANDIDATE evidence for a design change (e.g. a 21.A.95 minor-change substantiation), never eligibility by itself.
- Sister variants (maker family) — Engineering context only — a different variant is a different part until the governing data or an approved change says otherwise.
- OEM source-control numbers — The proprietary source-control drawing is exactly what fails the standard-part test: the OEM's number, not the bare catalogue item, carries the design-approval linkage.
- BMS / CML / OMAT references — The operator's governing maintenance data — where a consumable is listed in the approved CML/OMAT/AMM/CMM, that listing is the instrument that matters inside the operator's own approval system.
The routes, in the order to walk them:
- Classify the part. Is it a GENUINE standard part? If the IPC/CMM references only a public specification (AN/MS/NAS/SAE-AS/ISO/EN) with no OEM source-control drawing, buy at source with conformity traceable to that standard.
- Check for an approved alternate. The IPC/CMM/vendor list may already carry an alternate part number or vendor code — an already-approved alternate needs no new approval.
- Ask the design approval holder. Request the source-control data, written equivalence, or addition of the alternative source to the approved data. Document a refusal.
- Raise a design change. Via a Part-21J DOA (or EASA/ADOA): a 21.A.95 minor change adding the alternate to the approved data, backed by an identicality/equivalence file — dimensions, material, class, load rating, lubricant/seal, corrosion protection, acceptance criteria. Critical applications escalate to major change/STC.
- FAA-PMA / BASA path. Where the product is also FAA-certificated: PMA parts reach EASA aircraft under the BASA/TIP (non-critical directly; critical via EASA-validated STC).
- Production, release, traceability. Approved parts are produced under a POA, released on an EASA Form 1 (marked EPA where applicable), with EN/AS 9120-grade traceability into Part-145/CAMO acceptance.
Stage 1(a): we assemble the equivalence/identicality starter file — the cited evidence this graph holds, shaped for your DOA or compliance department to take forward. See pricing.
Regulatory explainer, not legal advice: paragraph numbers, derogations and the BASA/TIP revision change — verify against the current consolidated Regulation (EU) 748/2012, the EASA Easy Access Rules and the current TIP, and engage your DOA and competent authority early.
Search any number on the Spec-Crosswalk for the graded view with citations.
This crosswalk identifies candidate equivalents with cited evidence. It is not an airworthiness approval. Substitution decisions remain subject to your organisation’s procurement and engineering approval process and the governing maintenance data (AMM/CMM/SRM/CML/OMAT).