◆  Commercial in confidence · Portfolio cost analysis · human-in-the-loopatas.aero / Toolkit · ● Cost-Evaluation Portal
atas.aeroCost-Evaluation Heavy-maintenance programme 4 assets analysed
Tier 03 · Coming soon Preview of the Tier-03 Cost-Evaluation Portal. The cross-asset portfolio dashboard — savings tracker, cost-allocation heatmap, benchmark bands and the findings → review → initiative loop — is part of a bespoke Tier-03 engagement (the deep-dive / RFP shapes described on the Cost Intelligence diagnostic). The data below is illustrative. See engagement levels →
Cumulative realised savings · programme to date
£1.24M +£52k since asset D — forward expectation lowered
Every view answers: how did this change when the last asset was added, and what has it saved on the next one?

Cost-allocation heatmap

spend by category × asset · £k
Spend intensity low expected high outlier
Benchmark band
Heavy maintenance · per asset
£0.9Mexpected £1.6M£2.2M
Asset D (£2.11M) plots near the high edge — surfaced on arrival as an outlier.
Forward projection
Next asset, expected
£1.71M −£190k vs raw
Accumulated benchmark, adjusted down by savings banked from accepted initiatives.
Portfolio cost profile · labour / material across assets
Labour Material

Findings

analysis → review → initiative